Winding Woods Transmission Main
Posted on October 26th, 2011 by admin in Sewers & Water.
This Post has Comments Off
In order to install 2,180 linear units of watermain to a new subdivision built by the City of Timmins, Chartrand Equipment employed a new pipe fusing and directional drilling method, which allowed for trenchless pipe installation. Chartrand Equipment is one of a select few contractors in Ontario with operators...
See this project!
-
Water Transmission Main
Posted on October 26th, 2011 by admin in Sewers & Water.
This Post has Comments Off
Construction of a Secondary Water Transmission Main from McDonald Lake to South Porcupine. CHARTRAND EQUIPMENT has recently completed the construction of a secondary water transmission main from McDonald Lake to South Porcupine in the City of Timmins. The work included installing 6.2 km of a 300 mm diameter water...
See this project!
-
4th Street Reconstruction
Posted on October 26th, 2011 by admin in Sewers & Water.
This Post has Comments Off
The Corporation of the Township of Black River-Matheson hired CHARTRAND EQUIPMENT for the reconstruction of 4th street. The work involved jack and boring 35m under a stretch of Highway 11 and 24m under the railway tracks running across the Highway. The work also included replacing 34 m of a...
See this project!
-
Reconstruction of Devonshire Street and Cherry Street, Chapleau
Posted on October 19th, 2011 by admin in Sewers & Water.
This Post has Comments Off
On behalf of the Township of Chapleau, CHARTRAND EQUIPMENT completed the full reconstruction of approximately 550 m of roadway along Devonshire Street and Cherry Street. The work consisted of supplying all materials, labour and equipment to accomplish the following: the removal of old asphalt and grading the newly installed...
See this project!
-
No. 6 Tailing Basin
Posted on October 19th, 2011 by admin in Concrete Structures.
This Post has Comments Off
In co-operation with GoldCorp Inc., CHARTRAND EQUIPMENT constructed a new spillway at the No. 6 Tailings Basin site to prevent the dam from overtopping. Major work included clearing and grubbing the footprint of the tailings dam, excavation of organic materials, preparation of the bedrock materials, construction of the embankments,...
See this project!
-
Lake Shore Gold Hoist Room
Posted on October 19th, 2011 by admin in Concrete Structures.
This Post has Comments Off
CHARTRAND EQUIPMENT was in charge of completing not only the hoist room, but also the collar shaft and collar house foundations. This job included all the excavation, drilling, blasting, concrete foundation, installation of water lines for feed to the plant and subsequent discharge into the settling pond, as well...
See this project!
-
Wavell Road Bridge Rehabilitation
Posted on October 19th, 2011 by admin in Bridges.
This Post has Comments Off
CHARTRAND EQUIPMENT was hired by the Township of Black River Matheson to rehabilitate the Wavell Road Bridge. The scope of work included removing the running surface, removing the laminated deck and installing a new pressure treated laminated deck. The work further included the addition of a new running surface...
See this project!
-
Frederickhouse River Bridge
Posted on October 19th, 2011 by admin in Bridges.
This Post has Comments Off
CHARTRAND EQUIPMENT was a subcontractor hired to provide bridge demolition. Chartrand’s services included all excavation and granular supply and placement for the restructuring of the Frederickhouse River Bridge.
See this project!
-
Highway 101 Relocation – Final Paving, Grading and Drainage
Posted on October 19th, 2011 by admin in Mining.
This Post has Comments Off
In 2005 Placer Dome Pamour Pit underwent a major expansion project. CHARTRAND EQUIPMENT was hired to relocate part of Highway 101 from the south side of Three Nations Lake to the north side of Three Nations Lake, in order to accommodate the new overpass that would be built to...
See this project!
-
Hollinger Tailings Management Area
Posted on October 19th, 2011 by admin in Mining.
This Post has Comments Off
CHARTRAND EQUIPMENT has been awarded Phase I of this two phase project. The outcome of the project is to rehabilitate the site, relocate and cover acid generating tailings and improve the condition and water quality of Town creek. Phase I includes establishing access roads, diverting drainage into Gillies Pond,...
See this project!
-
Delnite Tailings Dam B Reslope
Posted on October 19th, 2011 by admin in Mining.
This Post has Comments Off
CHARTRAND EQUIPMENT has completed the rehabilitation of the Delnite Mine Tailings Dam B. The work consisted of environmental protection by installing silt fencing in order to prevent erosion during the construction phase so there would be no seepage of tailings into the water shed. The work also involved clearing...
See this project!
-
Broulan Headframe Demolition
Posted on October 19th, 2011 by admin in Drilling & Blasting.
This Post has Comments Off
CHARTRAND EQUIPMENT was retained for the purpose of demolishing the Broulan headframe and ore-bin structures. The structures were located on Florence Street, a site now owned by Goldcorp Canada Limited.
See this project!
-
Site Preparation for Shopper’s Drug Mart
Posted on October 19th, 2011 by admin in Demolition.
This Post has Comments Off
During the recent boom in the mining and construction industry in Timmins, many big box stores were enticed to open new business and/or expand on existing business. Shopper’s Drug mart opted to open a new location on Algonquin Boulevard and in doing so purchased an entire city block. CHARTRAND...
See this project!
-
Xstrata: Paste Fill Plant and Hopper & Conveyor Way
Posted on August 24th, 2011 by admin in Concrete Structures.
This Post has Comments Off
CHARTRAND EQUIPMENT was hired by Xstrata Kidd Mine Division to build a retaining wall for their paste fill plant loading ramp, as well as for the sand and tailings truck dumping hopper and conveyor way. For both of these projects, EFCO forms were utilized. Chartrand Equipment is vastly experienced...
See this project!